PV project Baoma Phase 1

Baoma Phase 1 is located in Yamandu, near Bo district in Sierra Leone. For the 5.9 MWp PV project with tracker system meteocontrol designed and realized power control and monitoring. The solution is based on the blue’Log X-Series and VCOM Cloud and was complemented by trainings.

System Data


  • Country: Sierra Leone
  • Installed power: 5.9 MWp
  • Completion: August 2022
  • Grid operator: Electricity Distribution and Supply Authority (EDSA)
  • Voltage level: medium voltage 33 KV

Services


  • Power control and monitoring solution
  • Power Plant Controller (PPC) based on the controller blue’Log XC
  • Setup in VCOM Cloud
  • Driver development for tracker system
  • Technical design and commissioning
  • Training