PV projects on the Balearic island of Mallorca
Eight projects with KS Management have been created on the Balearic island of Mallorca. The German company plans and implements photovoltaic systems in the utility sector in Germany, France and Spain.
The eight systems on Mallorca have a total installed capacity of around 22 MWp.
The energy generated corresponds to the consumption of around 9,500 households. All systems were connected to the grid between October 2023 and January 2024. meteocontrol supplied its certified Power Plant Controller (PPC) solution for all projects in accordance with the Spanish grid connection regulations NTS P.O.12.2 SENP.
The Spanish islands are subject to even stricter grid connection rules than the mainland because maintaining grid stability is more sensitive. In addition, the grid on an island must be regulated more quickly. meteocontrol has a certified solution for this with the blue'Log XC.
Remote commissioning and controller tuning were also carried out on all systems. In addition, KS Management is managed via the VCOM Cloud.
meteocontrol provided us with competent support for our projects from start to finish. This also enabled us to meet the special Spanish requirements. All systems are monitored in VCOM.
Arthur Seitz, Technische Betriebsführung KS ManagementSystem Data
- Location: Mallorca, Spain
- Installed capacity: 1.57 MWp - 3.38 MWp, 22 MWp in total
- Completion: 2023 - 2024
Services
- VCOM Cloud Monitoring
- blue‘Log XC
- Grid Code Compliance Services for Spain
- Power Control Station (Power Plant Controller)
- Data Station Commercial
- Remote Commissioning
- Controller Tuning