Power control for 38,8 MWp portfolio
In cooperation with Langa / Engie France Renouvelables, meteocontrol supplied DEIE stations based on the blue'Log XC for ten projects in France ranging from 585 kWp to 17MWp. The projects were completed in 2018 and 2019. All the sites equipped meet Enedis' grid requirements in terms of power management.
System data
Location: France
Completion: 2018-2019
Installed power: 38,8 MWp
Services
- blue'Log and sensors
- DEIE stations
- commissioning